Saturday, October 4, 2014

Catching Up... First Half of October


I was out of state for a bit so a lot less was accomplished . Mostly boring things…
  • Oven wiring
  • I put in a water line behind the oven just in case these things become useful or necessary at some point in the future. A hole was also put in for a drain line just in case.
  • Crawlspace encapsulation was completed.
  • The first three rows of the subfloor were FINALLY installed.
  • First draft of the lighting design for the kitchen, featuring entirely too many lights in a layout that was less than ideal. That’s why they’re called a draft.
  • I finally started looking into what it would take to make the wall go away.
All of these things mean very little to the way the place looks, so it’s a text only update this time!