Work slowed down some while I spent time researching and planning things. I chose a cabinet company, and also figured out that we want sliding doors for the pantry instead of ones that open and close like regular ones. I also spent a couple of days reworking the outlets on the wall behind the breakfast area. The old layout had two high outlets for bar signs and a third above countertop height, and of course zero on the floor. It was a lot of time disconnecting things in the attic, running wire down into the crawlspace to bypass the old ones I was removing/connect the new ones, and then tie back in with the existing circuit. That portion of the attic is about as far as someone can get from the ladder to climb up there so it’s no simple task.