At this point I’m getting closer to
finishing all the joist work on the project so I ordered the new
flooring, and also picked out a stain for the cabinets. I’ve gotten
pretty efficient at removing the old flooring and plywood. I’m
finally at the main beam running through the family room.
I also framed in the pantry. The plan
was to have the cabinet makers build doors from the same veneer as
the cabinets. I built it strong so it can stand up to people opening
and closing doors all the time. At this point I was getting a little
tired of working on the house.
No comments:
Post a Comment